WIM Resource Pty Ltd is an emerging major producer of Zircon, Rare Earths & Ilmenite. TWIM owns three individual JORC 2012 compliant mineral resources: Avonbank, Wedderburn & Bungalally deposits – totaling a cumulative resource inventory of near 1 Billion Tonnes of ore. This Tier 1 resource portfolio will enable WIM become the a world-class supplier of Zircon, Rare Earths & Ilmenite for the next 100 years.

The company’s flagship Avonbank Heavy Mineral Sands Project is currently at a final optimisation & approvals stage, with production is scheduled to commence from 2021. The Avonbank Project is expected to have a mine life of atleast 30 years.

Plans & Latest Developments:

Avonbank – World Class

The Avonbank Project is WIM’s flagship HMS project – with a mineral resource of 490 million tonnes @ 4.0% THM (JORC 2012, Measured, Indicated & Inferred). Key metrics include:

  • 30 year mine life
  • conventional dry mineral sands mining
  • conventional spiral separation
  • standard MSP
  • >80% of Zircon product meets premium ceramic grade specifications (>66.5% ZrO2+Hf) and very low Fe2O3 and TiO2
  • Rare Earth product is premium quality and meets downstream specifications
  • Low CAPEX – due to existing power, water supply and a rail loading facility in centre of project and direct mine site to port access – via a dedicated rail line
  • Will produce upwards of 400,000 tonnes of HMC per annum
  • Low trash mineral assemblage >70% VHM

The Wedderburn HMS Project

The Wedderburn HMS Project a shallow lying HMS deposit, with a low strip ratio. WIM has completed over 6000m of air core drilling and has defined a mineral resource estimate of 223 Million Tonnes of Ore, containing 2.9% THM (JORC 2012, Indicated & Inferred). Key attributes of the Wedderburn project include:

  • shallow mineralisation – with ore from surface in some areas of the deposit
  • >70-80% VHM in the mineral assemblage
  • nearby to exisitng rail & road infsratructure & regional Ports

The Bungalally HMS project

The Bungalally HMS project is shallow lying HMS project – with over 20% Zircon. The project is located 10km south of Horsham. WIM has completed three air core drilling programs, assays and detailed mineraogical studies. In 2015 WIM defined a Maiden Mineral Resource for Bungalally: 207 Million Tonnes of Ore, containing 2.7% THM (JORC 2012, Inferred).

Key attributes of the Wedderburn project include:

  • shallow mineralisation over much of the project area – low strip ratio
  • Higher grade south areas containing +3% THM
  • Mineralogical studies indicate +80% VHM – including 21% Zircon
  • nearby to exsiting infrastructure: rail, roads, power, water & several major Ports

Primary Commodities:

Mineral Sands

Stage of Development:

Development

Countries of Operation:

Australia

Board of Directors:

  • Mr Cixiong Cai – Chairman
  • Mrs Cathie Wu – Director
  • Mr John Bradley – Director
  • Mr Eddy Wu – CEO
  • Mr Tony Mason – Exploration Manager
  • Mr Michael Winternitz – Project Manager & Senior Geologist
  • Dr Steven Guo – Business Development Manager
  • Mr Barry Oldaker – Community Liason Officer

WIM Resource will be showcasing their mining projects to prospective investors at the International Mining and Resources Conference. Claim your complimentary investor pass.